Cherry Hill Culvert

Stormwater for the Cherry Hill subdivision drains under the Water Resources Institute parking lot and into a wetlands basin. The parking lot has begun to settle over the pipe, and the Water Resources Institute is no longer able to use this area of the parking lot. The 52-inch pipe’s outlet is right next to the edge of the parking lot, and the stormwater discharges at a high velocity resulting in scouring and voids above and around the pipe.

The City Council approved a Professional Services Agreement with TREKK Design Group on January 22, 2019 in the amount of $30,132.90. Design services include survey, preliminary and final design, bid phases, and construction phase services. Design is almost complete and includes parking lot repair, storm pipe extension, and bank regrading and stabilization. Construction is estimated to begin in spring 2020.



Accessibility Copyright NoticePhoto Credits Powered by CivicPlus
Proud Past. Bright Future506 Main Street Belton, Missouri 64012   Phone: (816) 331-4331