Click to Home
ShareEmailPrintRSS
Go To Search
Cambridge Culvert

Pavement over two 48-inch culverts located on Cambridge Road between Mullen Road and South Peculiar Drive has experienced deterioration and settlement. Based upon a site inspection, the pipe joints have separated and the soil from around both pipes is being washed through the pipes resulting in undermining the road bed.

The City Council approved a Professional Services Agreement with Olsson on April 9, 2019 in the amount of $322,258.00. Design services include survey, preliminary and final design, bid phase, and construction phase services. The design is almost complete, and the City is currently working on easements. Construction is anticipated to be completed in Spring 2020. 



Accessibility Copyright NoticePhoto Credits Powered by CivicPlus
Proud Past. Bright Future506 Main Street Belton, Missouri 64012   Phone: (816) 331-4331