Click to Home
ShareEmailPrintRSS
Go To Search
Sunrise Drive and Buena Vista Drive

The Sunrise Drive and Buena Vista Drive Stormwater Improvements Project is a Priority 1 project due to residential complaints regarding stormwater and street flooding. Stormwater flows from West Sunrise Drive southwest to Park Avenue through an open channel located behind residential homes on Buena Vista Drive and Valle Drive. The existing storm sewer system and open channel in this area are undersized resulting in stormwater and street flooding.

The City Council approved a Professional Services Agreement with CDM Smith on September 24, 2019 in the amount of $61,025.00. The first phase of this project includes survey and data collection, geotechnical investigations and analysis, and development of concept design alternatives with opinions of cost. Based on this data, a preferred alternative will be selected, and CDM Smith will subsequently submit an agreement for design.




Accessibility Copyright NoticePhoto Credits Powered by CivicPlus
Proud Past. Bright Future506 Main Street Belton, Missouri 64012   Phone: (816) 331-4331