Westside Drive and Lacy Lane

The Westside Drive and Lacy Lane Stormwater Improvements Project is a Priority 1 project due to residential and street flooding throughout the Lacy Estates subdivision. The conceptual improvement for this area includes upsizing the existing stormwater pipe system from Sunrise Drive to West Cambridge Road, replacing the existing low water crossing on Cambridge Road, as well as street preservation including asphalt mill and overlay and base repair.

The City Council approved a Professional Services Agreement with Olsson on September 24, 2019 in the amount of $361,965.00. Design services include survey, public meetings, storm sewer and bridge preliminary and final design, geotechnical exploration, utility coordination, permitting, bid phase, and construction phase services. 