Click to Home
ShareEmailPrintRSS
Go To Search
Storm Sewer - Proposition S
Storm Sewer.jpg
Contact
Michael Christopher
Interim Public Works Director

Nikia Freiberger
Assistant City Engineer

520 Main Street
Belton, MO  64012

Phone: (816) 331-4331
Fax: (816) 331-4331

Hours
Monday - Friday
8:00 am - 5:00 pm
The City of Belton's Stormwater Master Plan was completed by Olsson in December 2012. The Master Plan identified 30 stormwater projects throughout the City including seven (7) Priority 1 projects characterized by frequence and severity of home flooding, street flooding, erosion, regional benefit, etc.

Two of the Priority 1 projects were previously completed by the City, and the remaining five Priority 1 projects are to be completed with Proposition S stormwater general obligation bonds as funding allows.
  • Hight Avenue and Bryan Way/McKinley Street
  • Sunset Lane and North Hillcrest Drive (Hargis Lake)
  • Westside Drive and Lacy Lane
  • Sunrise Drive and Buena Vista Drive
  • Valentine Avenue and 162nd Street
Four additional priority projects are also included:
  • Cambridge Culverts
  • Cherry Hill Culvert
  • 161st Street and Allen Avenue Culvert
  • Hawthorne Drive and Redbud Lane (Alternate)

Click
Stormwater Project Locations Map for proposed project locations.




Accessibility Copyright NoticePhoto Credits Powered by CivicPlus
Proud Past. Bright Future506 Main Street Belton, Missouri 64012   Phone: (816) 331-4331