Click to Home
ShareEmailPrintRSS
Go To Search
Markey Parkway & Towne Center Drive Improvements

Project Description:
Contact
Zach Matteo, P.E.
City Engineer

City Hall Annex
520 Main Street
Belton, MO  64012

Ph: (816) 331-4331

Hours
Monday - Friday
8:00 am - 5:00 pm
The next phase of Markey Parkway, to connect Mullen Road to Y-Hwy/163rd Street, is open to traffic! The project includes the extension of Towne Center Drive to a new intersection with Markey Parkway. Both roads were opened at a ribbon cutting ceremony on April 2, 2015.

In addition to new roadway, a regional stormwater detention facility is under construction that developers within the drainage basin can utilize to consolidate stormwater runoff. 

A general location map and an aerial showing the regional detention facility are provided below. Click the maps for a larger view. 









    Downloads:

    Comprehensive Markey Parkway Map from Mullen Road to Quik Trip Way (13.6 MB)

    Project Maps:



    General Location Map of Markey Parkway


    Aerial Map of Markey Parkway



    Intranet Accessibility Copyright NoticePhoto Credits Powered by CivicPlus
    Proud Past. Bright Future506 Main Street Belton, Missouri 64012   Phone: (816) 331-4331