Project Description:
Contact
Zach Matteo
City Engineer

City Hall Annex
520 Main Street
Belton,MO  64012

Ph: (816) 331-4331
Fx: (816) 331-6973

Hours
Monday - Friday
8:00 am - 5:00 pm
The Cleveland Regional Lake Project is located adjacent to Cleveland Avenue between W. Sunrise Drive and Cambridge Road.  The project objectives are as follows:

  • Eliminate 100-year flooding of downstream properties, primarily homes along Park Avenue immediately downstream of the proposed lake
  • Control 100-year flooding at Cleveland Avenue
  • Reduce downstream channel erosion
  • Provide a public recreational amenity

The lake’s pool surface area will be approximately 8 acres. A proposed dam running roughly parallel to Cleveland Avenue is an earthen embankment with an average height of approximately 12 feet across the entire length of the dam and a maximum height of 24 feet.  A 5’x10’ concrete box culvert will serve as the primary spillway, or outlet, for the lake. 

Additional improvements include water quality and recreational enhancements such as a pedestrian trail, a parking lot, boat ramp, wetland areas, boardwalks, native vegetation and tree establishment, and wildlife habitat areas.

A ribbon cutting ceremony was held on Tuesday, October 22 to officially open our new lake and park!

Estimated Project Cost: $2.5 Million



Photos:
September 25, 2013

September 18, 2013


August 28, 2013


April 2013



January 11, 2013


December 28, 2012


November 27, 2012


Project Figures:
Cleveland2.JPG
Project Vicinity Map for the Cleveland Regional Lake Project


Cleveland.JPG
Planned Improvements for the Cleveland Regional Lake Project



Project Schedule from Clarizen.com: